This section is to highlight the Standard Gauge locomotives & cars Barry builds.
These models are scratch-built, modeling Standard Gauge equipment in 1/22.5 scale ratio.
They run on the wider Gauge 3 trackage (not
Gauge 1 or LGB / G gauge tracks).
Still "G scale"
modeling in 1/22.5 ratio and correct Standard Gauge models.
( unlike firms that make “Standard
Gauge” models that use the smaller 1/29 or 1/32 scales, that run on LGB G track )
< Back > to the Colorado & Western home page
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
3/30/2019 - Elk Park Fuel & Coal office, a new wood structure was built for this location
3/28/2019 - the Std Ga Passenger Truck is completed and tested, completing the first step
3/24/2019 - a Std Ga Passenger truck is built for some tests and the future Passenger Car
Krauss
Maffei Diesels
- two German made, ML-4000 locomotives ( May
2017 to... )
Dynamometer Car #10 - Rio Grande
diesel locomotive test car ( March - April
2017 )
W M Shay #6 - Western Maryland, 3-truck, Shay #6 project page ( Fall 2015 / early 2016 )
11/11/09 - Storage gauge storage tracks were built for the new SG
engines
9 / 9 / 09 - the Magnus S-1 diesel is painted for
F 3
Diesel - photos of the F 3 diesel,
revised Nov. 2009
Cabooses - photos of the Caboose project, revised
8/21/09
L 131 - the largest locomotive the D&RGW
had, revised 6/10/08
Tank Cars - the tank cars are built, revised 4/15/08
9/2007b - the finished and painted C-41 Locomotive
9/2007a - the drives for the L-131 are being built
8/2007c - the C-41 Engine and Tender come together
8/2007b - C-41 Back head details and Cab work
8/2007a - work on the C-41 Boiler has started
7/2007 - the C-41 running gear gets more detail work
6/2007 - work on a C-41 2-8-0 Consolidation has started
5/2007 - the largest D&RGW loco, work starts on a L-131 tender
12/2005 - completed 36 foot L & N Hopper car, painted & lettered
11/2005 - the initial work on the 36 foot L & N Hopper car
10/2005 - completed Little River 2-4-4-2 engine, painted and ready
9/2005 - Little River #126, a 2-4-4-2 locomotive is started on
7/2005 - Barry starts work on the Little River 2-4-4-2 tender
5/2005a - 40 foot Box cars,
the first car is painted and in service
4/2005b - 40 foot Box cars, details from brake wheels to rigging
4/2005a - 40 foot Box cars, from casting pieces to assembled car
3/2005 - 40 foot Steel Sided Gondolas, construction and finished
2/2005 - Big Standard Gauge Cabooses, plus a Magnus S1 diesel
10/2004 - The 2-6-6-0 Mallet is painted and impressive!
9/2004 - The 2-6-6-0 Mallet is finished and ready for painting.
8/2004 - Progress on the Standard Gauge 2-6-6-0 engine and tender.
4/2004 - The Standard Gauge Idler cars are built.
< Back > to the Colorado &
Western home page