D&RGW  C-41  Boiler Work

Barry has been working on the boiler, which was the main part of the C-41

that the Rio Grande used to build the Narrow Gauge K-37 Mikado.

 

CWC41_Aug07a.jpg

CWC41_Aug07b.jpg

CWC41_Aug07c.jpg

CWC41_Aug07d.jpg

CWC41_Aug07e.jpg

CWC41_Aug07f.jpg

 

< BACK >    to the Standard Gauge photo page                                                       Page loaded 8/02/07