Barry has started working on a Standard
Gauge C-41, a common 2-8-0 engine.
This is the class of loco the
What a way to compare NG to
Barry normally builds the tender first,
then after starts on the engine.
< BACK > to the Standard Gauge photo page Page loaded
6/30/07