D&RGW  C-41  Back head & Cab

Work on the back head of the boiler and the cab.

The engine now starts takings shape!

 

CWC41_Aug07G.jpg

CWC41_Aug07H.jpg

CWC41_Aug07I.jpg

CWC41_Aug07J.jpg

CWC41_Aug07K.jpg

CWC41_Aug07L.jpg

 

< BACK >    to the Standard Gauge photo page                                                       Page loaded 8/10/07