Liver River Engine Construction

Working with good plans, Barry starts work on the 2-4-4-2 “standard gauge” mallet.

From ground up its almost all scratch built, using two LGB motor blocks for power.

The last photo shows how it looks sitting next to his huge Std. Ga. 2-6-6-0 D&SL mallet!

Back  to the standard gauge photos list                                     Page created Sept 2005

LREng01.jpg

LREng02.jpg

LREng03.jpg

LREng04a.jpg

LREng05.jpg

LREng06.jpg

LREng07.jpg

LREng08.jpg