Barry Bogs'  Standard Gauge

R P O  /  Railway Post Office

September 21st, 2020

The interior work is done and the paint work is started.  Many details were fabricated, from the mail slots to the mail bags.
When people pear inside the doors or windows, they will find lots of neat details to see inside the RPO.

CW-20200921-a.JPG
CW-20200921-b.JPG CW-20200921-c.JPG CW-20200921-d.JPG CW-20200921-e.JPG CW-20200921-f.JPG CW-20200921-g.JPG
to the 40ft RPO page   the C&W home page  Page created  10/14/2020