Barry Bogs' Standard Gauge R P O / Railway Post Office August 23rd, 2020 |
With the body sides assembled, the underframe built. Time for various details under the car. Many will not notice all the details that go under the car, like the brake system with air resevoir, air lines, manual brake rigging, and the steps. |
to the 40ft RPO page | the C&W home page | Page created 8/29/2020 |