D & R G W   F81
2-10-2  Locomotive Progress

September 12th, 2019 
-  Cab Construction
 
Cab construction included many pieces and different shapes and curves, to be fabricated. Putting these together and adding the piping and rivots and details, takes time.
CW20190912a.JPG CW20190912b.JPG CW20190912c.JPG
CW20190912d.JPG CW20190912e.JPG CW20190912f.JPG

 Click any photo to enlarge and scroll between the various pictures.

"the boys fabricated the basic cab for the F81, and did a three layer roof roll on to the walls. Not easy, but the boys came through and got it done. Once the roof was on, the boys started the tedious task of placing all the rivets on the cab. There are many details that had to be added to the cab, that could be easily overlooked, but I kept the boys on track until they got it right. I need to get the backhead done, now that the cab is finished, so that will most likely be the next item to complete."  - -  Barry