2-10-2  Locomotive Progress

August 18th  -  Boiler Built
 
Boiler assemble is now complete, with the various tapers in the boiler seen here, with bands around the boiler. Plus the smokebox door is built and many rivots (HO track nails) were put in as well.
CW20190818a.JPG CW20190818b.JPG CW20190818c.JPG
CW20190818d.JPG CW20190818e.JPG CW20190818f.JPG

 Click any photo to enlarge and scroll between the various pictures.

"After the basic boiler was finished in the last update, I directed the boys to get the rivets and staybolts finished on the boiler and then move on to the cab support and running boards. Well, the boys seemed like they were taking their good sweet time to get the rivets done. When I asked them about it, trying to hold back my thoughts, they reminded me that every rivet or staybolts had to be marked for location, drilled, inserted, and set in place. They said why don't I try it, so I did..... well, I  remember now why it takes so long when your doing over a thousand of them on the boiler alone.....Once that part was done, I felt that the cab support was the next thing to install. With that done, the running boards were the next step to get it on it's way. Fitting them was not easy either, as the boiler is not straight, and required many test fits to get it right. With the boardwalks done, the smoke box door was on the menu. Although the details are not finished on the door, it was time to call it a day, and I let the boys go home...   "  - -  Barry

  to the F81 project page    the C&W home page  Page updated  8/22/19