Durango  Station    -  January 2011

The Station is mostly done on the outside, some more details to add.  Next, the interior.

CW20110130a.jpg

CW20110130b.jpg

CW20110130c.jpg

CW20110130d.jpg

CW20110130e.jpg

CW20110130f.jpg

 Well, the station is almost complete. The figures are not necessarily where they are going to stay. I thought about installing some lights on it, and may still do that. I have a figure and desk in the bay window, that can be seen from the track angle. Other than that, there is no other interior details yet. I am very pleased with how the roof came out, that Ward Hammond cut for me. Ward is also sending some REA signs that will go over the freight doors.  It is a little tough to walk by it, but not bad. The whole thing comes off the layout with four bolts, so there is nothing permanent and it is back to what it was.    - Barry

< Slideshow >                < Return >   to the Progress Photos section                      Created 1/30/11

Note:   the photos in slideshow are smaller than opening directly above.

First two photos are larger 1600x1200 size to see details!