Elk  Park  Ore  Transfer

February 2006 saw construction of the Ore Transfer facility in Elk Park, which allows narrow gauge cars

to dump ore in to the chutes, to transfer to the standard gauge (or narrow gauge) cars below.

 

BACK   to the pictures page                                 Page created  3/16/06

 

SilTranfera.jpg

SilTranferb.jpg

SilTranferc.jpg

SilTranferd.jpg

SilTranfere.jpg

SilTranferf.jpg

SilTranferg.jpg

SilTranferh.jpg

 

SilTranferi.jpg

SilTranferj.jpg