The Crew during an Operating Session

Once a month, we operating on the railroad. Operations include a computer generated switch-list, multi-train traffic, one or two man crews and a lot of fun!

<Back>   to the pictures page

People1.jpg

Barry Bogs, MMR in Gn3, pondering which train to run

People2.jpg

Barry a few month before, note the Silver Vista car

People3.jpg

Craig Brantley, building his train in the Durango yard

People4.jpg

Frolin Marek, Dispatcher, Engineer and general pain

People5.jpg

Doug eases up to a Kadee magnet to uncouple

People6.jpg

Craig switching in the "Silverton Room"

People7.jpg

Rockwood, switching, dual-gauge track and Craig

People8.jpg

The crew one evening after running trains!

RailOpSwitchlist.jpg

RailOp switchlist software is used for operations

Scenery1.jpg

New scenery was added on one end of the yard

Scenery2.jpg

Three levels of track can be seen in this picture

Scenery3.jpg

The Silverton Car Shop, with initial details added

This page created on 11/22/02.