Its late October 2002 and loads of hydrocal has been installed. Plus the
10-stall Durango roundhouse is being built.
|
Barry at work on
the new roundhouse
|
|
|
Construction is
done in place here, not on the workbench
|
|
|
The roundhouse
will have 10-stalls, plus 2 tracks outside as well
|
|
|
This wood started
off as a 1x6" board. It is nailed and glued.
|
|
|
Note the heavy
wood beams, just like the real thing would have
|
|
|
Three levels of
trackwork, with scenery installed
|
|
|
Various trees
grow in Colorado and are on this Barry's layout
|
|
|
Can you tell what
season it is here?
|
|
|
The floor to
ceiling scenery has started here, more to come
|
|
|
Weeds always grow
in the rock work
|
|
|
The scenery
blends in and over the photo murals, in Silverton
|
|
|
Snows on the high
line created the need for snow-sheds
|
|
|
This snow-shed is
on a curve, adding to the effect when you see it
|
|
|
Note the detail
here, includuing board by board construction
|
|
|
The effect of
having scenery really shows here, three level
|
|
|
No matter the
angle, this is one great view
|
|
|
The ground cover
includes ballast, dirt, weeds and more
|
|
|
Weeds, weeds and
more... weeds!
|
|
|
|