< Back > to
main Marek Mountain RR page
July 4h 09
– Lite
Operating Session after the BBQ social, with
Mar. 29th 09 – Silverado scenery mock up, track vs. trees
Mar. 7th 09
–
Feb. 2009 – Proposed spur
construction starts in
Aug 31st 07 – Social and Operating Session, a shake down run after new construction
Aug 23rd 07 – Open House for area “G Gaugers” had the layout up and running
Aug 2007b – Wiring Alamosa, which includes a custom reverse loop circuit and new panel design
Aug 2007a – Benchwork, the Los Pinos area get plywood as Alamosa gets covered
July 2007 – lower level, Alamosa storage yard tracks near completed
Early 2007 – Four storage spurs are added to the Alamosa track area
April 2006 – Track work is starting on the Alamosa Staging yard area!
May 2005 – Switches get installed on the Alamosa storage area ladder.
March 2005 – Scratch building switches in Gn3, from 1x8” board to spiking.
Summer 2004 – The lower storage level of Alamosa has bench work installed
June/July 2003 – After using some old module tables and LGB section track for the first years, its time to finish the benchwork and build the yard. Here is an overview of the temporary yard, then the plans for the Los Pinos yard and also, the Alamosa storage area that will be located and hidden, directly under the yard.
February 2003
– The
January 2003
– Photo
murals were installed above the tracks in Vista Grande. This means, I get to
walk up in the morning to real huge pictures of the
June 2002
– Trains
reach
May 2002 - Trains are running on the layout! These picture give an overview of the trackage running from the Los Pinos yard area (temporary benchwork and LGB track), through the bedroom area of Vista Grande, and up the hill to the mining camp of Silverado!
February 2000 - Trains are running on the layout! These picture give an overview of the trackage running from the Los Pinos yard area (temporary benchwork and LGB track), through the bedroom area of Vista Grande, and up the hill to the mining camp of Silverado!