Jim Sinclair -
Southern Pacific - HO
About 90% of the track is down, some terrain is in. The Roseville yard is basically complete except for the icing facility. Four industrial areas are about 98% complete. When completed the RR will support fourteen to eighteen operators and a dispatcher. The dispatcher will control the double mainline traffic utilizing a computer program. Eventually a detection system will support the dispatcher in controlling the heavy traffic. Covid: Proof of completed vaccination required Open: Friday and Saturday |
Click any mini-photo to expand. You can
scroll thru pictures once expanded.
to the layouts page | layout on tour | layout on tour |